
230LM of temporary edge protection was installed to enhance construction safety on the plant room PODS at the Multiplex's construction of the iconic New Sydney Fish Market. This included two systems for the initial installation of the roof, followed by an on-roof installation, ensuring height safety while allowing trades to continue construction safely.

A 475 lineal meter installation of temporary edge protection for construction safety at the new Rapid Plas manufacturing facility in Tamworth, ensuring height safety during the project.

A heritage listed site as Sydney's very first skyscraper (former AMP building), located in the heart of Circular Key was rerefurbed from the ground up. Foresight Safety installed over 60 lineal meters of temporary edge protection to the 26th floor for roof installation at over 100 meters high.

A 220 Lineal Meter installation of temporary edge protection for roof installtion at the Scone Regional Airport Hanger site, ensuring height safety during the building process.

A 200 Lineal meter installation of temporary edge protection at 26M high for roof sheet installation, complemented by a full roof coverage static line for permanent height safety.

A 200 LM installation of temporary edge protection at Cummins diesel Tamworth.

A 350 LM installation of temporary edge protection for the new production facility at Bay Timber Beresfield.




A 75LM installation of temporary edge protection at Prospect water treatment plant for roof sheet installation.








